104,321
Rail
Information
Rail
-
null
null
104,322
The station must comply with local regulations concerning accessibility for individuals with disabilities.
Requirement
Station
Urban
Compliance Testing
Inspection
104,323
This requirement stems from the city's commitment to ensure equitable access to public transportation.
Requirement
Station
Urban
Documentation Review
Stakeholder Review
104,324
The rail yard must have a capacity to handle a minimum of 20 trains simultaneously.
Requirement
Rail
Urban
Capacity Testing
Simulation
104,325
The rail yard serves as the primary rail hub for the city and is expected to be handling significant train traffic.
Requirement
Rail
Urban
Traffic Analysis
Observation
104,326
A digital signaling system in line with PTC (Positive Train Control) standards must be implemented.
Requirement
Signalling
Urban
System Testing
Field Testing
104,327
The choice of digital over traditional signaling systems reflects the increased focus on safety and efficiency in rail operations.
Information
Signalling
Urban
null
null
104,328
The station must provide public WiFi access and charging points for devices.
Requirement
Station
Urban
Functionality Testing
User Testing
104,329
This feature is essential for modern urban commuters who need connectivity during their journey.
Requirement
Station
Urban
User Feedback
Field Testing
104,330
Conduct a comprehensive traffic impact study for the downtown area.
Requirement
General Infrastructure
Downtown
Study/Analysis
Data Collection
104,331
The station's location in the bustling downtown area means its construction and operation will have significant implications for local traffic patterns.
Requirement
Station, General Infrastructure
Downtown
Traffic Analysis
Observation
104,332
Implement advanced surveillance systems to enhance security at the station and yard.
Requirement
Station
Urban
System Testing
Field Testing
104,333
Given the high volume of passengers and the downtown location, security is a top priority.
Requirement
Station
Urban
Compliance Testing
Inspection
104,334
The station must have protection measures against potential electromagnetic interference to and from surrounding buildings.
Requirement
Station, General Infrastructure
Urban
Electromagnetic Testing
Field Testing
104,335
The downtown area is a dense cluster of commercial and residential buildings, many of which have systems that could cause or be affected by electromagnetic interference.
Information
General Infrastructure
Urban
null
null
104,336
Infrastructure Requirement: Noise barriers must be installed to limit noise pollution to surrounding residential areas.
Requirement
General Infrastructure
Urban
Noise Testing
Field Testing
104,337
This is especially important given the proximity of residential buildings to the proposed rail corridor.
Information
General Infrastructure
Urban
null
null
104,338
Infrastructure
Information
General Infrastructure
-
null
null
104,339
Rail Requirement: Rails must be installed with anti-vibration measures to limit the transfer of vibrations to nearby buildings.
Requirement
Rail
Urban
Vibration Testing
Field Testing
104,340
Several high-rise buildings along the corridor necessitate vibration mitigation strategies.
Information
General Infrastructure, Rail
Urban
null
null
104,341
Signaling Requirement: Advanced train control systems must be employed to ensure safe distances are maintained between trains, even at peak times.
Requirement
Signalling
Urban
System Testing
Field Testing
104,342
Given the high volume of traffic expected on this corridor, advanced train control systems are necessary.
Information
Signalling
Urban
null
null
104,343
Utilities Requirement: Conduct a utility mapping exercise to understand and plan for any necessary relocation of utilities.
Requirement
Utilities
Urban
Mapping/Analysis
Field Verification
104,344
The urban corridor is expected to cross numerous underground utilities, making this a necessary preliminary step.
Information
Utilities, General Infrastructure
Urban
null
null
104,345
A stakeholder engagement plan must be implemented to manage the impact on residents and businesses along the corridor.
Requirement
General Infrastructure
Urban
Stakeholder Review
Stakeholder Feedback
104,346
The high population density and commercial activity in this area necessitate effective communication and engagement with affected parties.
Information
General Infrastructure
Urban
null
null
104,347
Implement advanced level crossing warning systems to ensure pedestrian safety.
Requirement
General Infrastructure
Urban
System Testing
Field Testing
104,348
Given the urban setting, numerous pedestrian crossings are expected along this corridor.
Information
General Infrastructure
Urban
null
null
104,349
The rail corridor must comply with electromagnetic compatibility standards to prevent interference with signal systems of adjacent transport lines.
Requirement
Rail
Urban
Electromagnetic Testing
Field Testing
104,350
The corridor runs parallel to other transport lines including bus and tram routes that use various electronic and signal systems.
Information
Rail
Urban
null
null
104,351
The station must include sufficient parking facilities, including secure spaces for bicycles.
Requirement
Station
Urban
Capacity Testing
Inspection
104,352
The suburban station is expected to serve commuters who prefer to bike or drive to the station.
Information
Station
Suburban
null
null
104,353
The tracks at the station must be designed to allow express trains to bypass without causing delays to other trains.
Requirement
Station
Urban
Track Analysis
Simulation
104,354
This station is one of several on a busy line, with a mix of local and express services planned.
Information
Station
Urban
null
null
104,355
Platform display
null
null
null
null
null