text
stringlengths 1.39k
1.4k
|
---|
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 192.65 , Clean gas temperature after demister is 29.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.13 , cold water supply pressure is 0.01 , cold water supply temperature is 22.01 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 193.89 , Clean gas temperature after demister is 30.43 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.23 , cold water supply pressure is 0.01 , cold water supply temperature is 22.03 , Hydraulic oil Temperature is 23.55 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.38" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 196.7 , Clean gas temperature after demister is 31.59 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.09 , cold water supply pressure is 0.01 , cold water supply temperature is 22.03 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.01 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 220.99 , Clean gas temperature after demister is 32.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.16 , cold water supply pressure is 0.01 , cold water supply temperature is 22.04 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 191.9 , Clean gas temperature after demister is 33.8 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.17 , cold water supply pressure is 0.01 , cold water supply temperature is 22.06 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.02 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 149.04 , Clean gas temperature after demister is 34.45 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.1 , cold water supply pressure is 0.01 , cold water supply temperature is 22.08 , Hydraulic oil Temperature is 23.53 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.02 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 149.17 , Clean gas temperature after demister is 34.6 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.02 , cold water supply pressure is 0.01 , cold water supply temperature is 22.08 , Hydraulic oil Temperature is 23.53 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 149.19 , Clean gas temperature after demister is 34.59 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.02 , cold water supply pressure is 0.01 , cold water supply temperature is 22.1 , Hydraulic oil Temperature is 23.53 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.01 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 149.73 , Clean gas temperature after demister is 34.78 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.17 , cold water supply pressure is 0.01 , cold water supply temperature is 22.11 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.04 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 150.27 , Clean gas temperature after demister is 35.08 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.17 , cold water supply pressure is 0.01 , cold water supply temperature is 22.12 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.04 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.21" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.52 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 151.1 , Clean gas temperature after demister is 35.21 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.12 , cold water supply pressure is 0.01 , cold water supply temperature is 22.14 , Hydraulic oil Temperature is 23.54 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.25 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 151.41 , Clean gas temperature after demister is 35.38 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.19 , cold water supply pressure is 0.01 , cold water supply temperature is 22.16 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.11 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 152.03 , Clean gas temperature after demister is 35.15 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.19 , cold water supply pressure is 0.01 , cold water supply temperature is 22.18 , Hydraulic oil Temperature is 23.55 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.31 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 152.39 , Clean gas temperature after demister is 34.78 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.18 , cold water supply pressure is 0.01 , cold water supply temperature is 22.19 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 152.72 , Clean gas temperature after demister is 34.74 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.23 , cold water supply pressure is 0.01 , cold water supply temperature is 22.22 , Hydraulic oil Temperature is 23.55 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.54 , Clean gas temperature after demister is 34.82 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 22.24 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.21 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.21" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.31 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.62 , Clean gas temperature after demister is 34.87 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.21 , cold water supply pressure is 0.01 , cold water supply temperature is 22.26 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.01" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 153.6 , Clean gas temperature after demister is 34.86 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.24 , cold water supply pressure is 0.01 , cold water supply temperature is 22.29 , Hydraulic oil Temperature is 23.56 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 5.76" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 153.81 , Clean gas temperature after demister is 34.6 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.18 , cold water supply pressure is 0.01 , cold water supply temperature is 22.31 , Hydraulic oil Temperature is 23.57 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.33" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.32 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.83 , Clean gas temperature after demister is 34.84 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.22 , cold water supply pressure is 0.01 , cold water supply temperature is 22.34 , Hydraulic oil Temperature is 23.57 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.54" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 154.27 , Clean gas temperature after demister is 34.8 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.2 , cold water supply pressure is 0.01 , cold water supply temperature is 22.38 , Hydraulic oil Temperature is 23.58 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.21 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 19.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.44" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.31 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 154.64 , Clean gas temperature after demister is 34.59 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.93 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.0 , cold water supply pressure is 0.01 , cold water supply temperature is 22.38 , Hydraulic oil Temperature is 23.57 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 23.34 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.42" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.24 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 154.78 , Clean gas temperature after demister is 34.31 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.07 , cold water supply pressure is 0.01 , cold water supply temperature is 22.42 , Hydraulic oil Temperature is 23.58 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 27.81 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.36" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 154.8 , Clean gas temperature after demister is 34.1 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.12 , cold water supply pressure is 0.01 , cold water supply temperature is 22.43 , Hydraulic oil Temperature is 23.58 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 29.22 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 154.81 , Clean gas temperature after demister is 33.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.08 , cold water supply pressure is 0.01 , cold water supply temperature is 22.47 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.09 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 38.34 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 154.78 , Clean gas temperature after demister is 33.28 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.12 , cold water supply pressure is 0.01 , cold water supply temperature is 22.5 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.9 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 154.19 , Clean gas temperature after demister is 32.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 22.53 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 39.39 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.73 , Clean gas temperature after demister is 32.38 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.23 , cold water supply pressure is 0.01 , cold water supply temperature is 22.55 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 38.02 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.67 , Clean gas temperature after demister is 32.09 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.22 , cold water supply pressure is 0.01 , cold water supply temperature is 22.57 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 43.31 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.23 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 153.46 , Clean gas temperature after demister is 31.46 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.13 , cold water supply pressure is 0.01 , cold water supply temperature is 22.62 , Hydraulic oil Temperature is 23.6 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 50.18 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 153.18 , Clean gas temperature after demister is 31.21 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.05 , cold water supply pressure is 0.01 , cold water supply temperature is 22.65 , Hydraulic oil Temperature is 23.61 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 52.95 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 152.53 , Clean gas temperature after demister is 30.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.1 , cold water supply pressure is 0.01 , cold water supply temperature is 22.67 , Hydraulic oil Temperature is 23.62 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 54.93 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.24 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 152.42 , Clean gas temperature after demister is 30.86 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.05 , cold water supply pressure is 0.01 , cold water supply temperature is 22.7 , Hydraulic oil Temperature is 23.63 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 53.52 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.18" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.3 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 152.43 , Clean gas temperature after demister is 30.57 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.18 , cold water supply pressure is 0.01 , cold water supply temperature is 31.26 , Hydraulic oil Temperature is 23.63 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.92 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 152.16 , Clean gas temperature after demister is 30.07 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.16 , cold water supply pressure is 0.01 , cold water supply temperature is 22.71 , Hydraulic oil Temperature is 23.63 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.58 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.22 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 201.05 , Clean gas temperature after demister is 29.61 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.2 , cold water supply pressure is 0.01 , cold water supply temperature is 22.75 , Hydraulic oil Temperature is 23.64 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.82 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 228.01 , Clean gas temperature after demister is 29.41 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.1 , cold water supply pressure is 0.01 , cold water supply temperature is 22.78 , Hydraulic oil Temperature is 23.65 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 50.04 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.29 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 228.08 , Clean gas temperature after demister is 29.3 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 22.81 , Hydraulic oil Temperature is 23.65 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 50.69 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.13" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 228.05 , Clean gas temperature after demister is 29.14 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 22.85 , Hydraulic oil Temperature is 23.65 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.63 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 227.99 , Clean gas temperature after demister is 28.99 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 22.86 , Hydraulic oil Temperature is 23.68 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 52.15 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 227.98 , Clean gas temperature after demister is 28.74 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 22.9 , Hydraulic oil Temperature is 23.68 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.11 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 227.89 , Clean gas temperature after demister is 28.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.33 , cold water supply pressure is 0.01 , cold water supply temperature is 22.93 , Hydraulic oil Temperature is 23.67 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 49.2 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.07 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 227.51 , Clean gas temperature after demister is 28.97 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.22 , cold water supply pressure is 0.01 , cold water supply temperature is 22.96 , Hydraulic oil Temperature is 23.7 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.87 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.25 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 227.49 , Clean gas temperature after demister is 28.77 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 22.99 , Hydraulic oil Temperature is 23.69 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 53.76 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 186.21 , Clean gas temperature after demister is 29.24 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.01 , cold water supply temperature is 23.02 , Hydraulic oil Temperature is 23.71 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 54.57 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.23 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 153.6 , Clean gas temperature after demister is 29.37 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.01 , cold water supply temperature is 23.05 , Hydraulic oil Temperature is 23.72 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 54.94 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 154.9 , Clean gas temperature after demister is 29.27 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.01 , cold water supply temperature is 23.09 , Hydraulic oil Temperature is 23.75 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 53.83 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.13" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.28 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 226.7 , Clean gas temperature after demister is 29.33 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.01 , cold water supply temperature is 23.13 , Hydraulic oil Temperature is 23.75 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.64 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.13" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 237.36 , Clean gas temperature after demister is 29.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 23.15 , Hydraulic oil Temperature is 23.76 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 50.35 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 245.08 , Clean gas temperature after demister is 29.41 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 23.19 , Hydraulic oil Temperature is 23.78 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 36.12 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.24 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 245.19 , Clean gas temperature after demister is 29.15 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.36 , cold water supply pressure is 0.01 , cold water supply temperature is 23.22 , Hydraulic oil Temperature is 23.8 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 35.72 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.02 , Clean gas temperature after demister is 28.62 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 23.25 , Hydraulic oil Temperature is 23.8 , Gas Scrubber is being operated at pressure of 0.02 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 40.24 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.69, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.07 , Clean gas temperature after demister is 27.96 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 23.28 , Hydraulic oil Temperature is 23.83 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 40.58 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.42" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 244.96 , Clean gas temperature after demister is 27.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 23.33 , Hydraulic oil Temperature is 23.85 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 38.38 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.1" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 244.9 , Clean gas temperature after demister is 27.15 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.47 , cold water supply pressure is 0.01 , cold water supply temperature is 23.37 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 38.16 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.09" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 244.85 , Clean gas temperature after demister is 26.87 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 23.41 , Hydraulic oil Temperature is 23.88 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 36.65 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 244.31 , Clean gas temperature after demister is 26.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.56 , cold water supply pressure is 0.01 , cold water supply temperature is 23.45 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.88 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 243.98 , Clean gas temperature after demister is 26.26 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 23.48 , Hydraulic oil Temperature is 23.92 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 32.27 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 243.81 , Clean gas temperature after demister is 25.75 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.65 , cold water supply pressure is 0.01 , cold water supply temperature is 23.52 , Hydraulic oil Temperature is 23.93 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 29.62 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.15" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 243.85 , Clean gas temperature after demister is 25.32 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.69 , cold water supply pressure is 0.01 , cold water supply temperature is 23.56 , Hydraulic oil Temperature is 23.97 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 25.77 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 243.66 , Clean gas temperature after demister is 25.11 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.7 , cold water supply pressure is 0.01 , cold water supply temperature is 23.63 , Hydraulic oil Temperature is 23.97 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 22.41 , Water Flow through Pre scrubber nozzle is 23.6\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 243.22 , Clean gas temperature after demister is 24.81 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.72 , cold water supply pressure is 0.01 , cold water supply temperature is 23.7 , Hydraulic oil Temperature is 23.98 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 15.27 , Water Flow through Pre scrubber nozzle is 21.0\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 243.07 , Clean gas temperature after demister is 24.4 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.74 , cold water supply pressure is 0.01 , cold water supply temperature is 23.78 , Hydraulic oil Temperature is 24.0 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 10.16 , Water Flow through Pre scrubber nozzle is 14.0\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 242.81 , Clean gas temperature after demister is 24.24 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.76 , cold water supply pressure is 0.01 , cold water supply temperature is 23.87 , Hydraulic oil Temperature is 24.01 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 5.64 , Water Flow through Pre scrubber nozzle is 8.3\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.26 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.88 , Clean gas temperature after demister is 23.77 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.77 , cold water supply pressure is 0.01 , cold water supply temperature is 23.96 , Hydraulic oil Temperature is 24.04 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 2.73 , Water Flow through Pre scrubber nozzle is 4.7\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.66 , Clean gas temperature after demister is 23.63 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.8 , cold water supply pressure is 0.01 , cold water supply temperature is 24.05 , Hydraulic oil Temperature is 24.05 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 1.99 , Water Flow through Pre scrubber nozzle is 2.5\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.26 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.71 , Clean gas temperature after demister is 23.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.78 , cold water supply pressure is 0.01 , cold water supply temperature is 24.1 , Hydraulic oil Temperature is 24.07 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.73 , Clean gas temperature after demister is 23.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.76 , cold water supply pressure is 0.01 , cold water supply temperature is 24.17 , Hydraulic oil Temperature is 24.08 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.22 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.55 , Clean gas temperature after demister is 23.12 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.83 , cold water supply pressure is 0.01 , cold water supply temperature is 24.25 , Hydraulic oil Temperature is 24.12 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 242.08 , Clean gas temperature after demister is 22.88 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.75 , cold water supply pressure is 0.01 , cold water supply temperature is 24.34 , Hydraulic oil Temperature is 24.12 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.08 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 241.73 , Clean gas temperature after demister is 22.68 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.78 , cold water supply pressure is 0.01 , cold water supply temperature is 24.42 , Hydraulic oil Temperature is 24.15 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 241.61 , Clean gas temperature after demister is 22.47 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.73 , cold water supply pressure is 0.01 , cold water supply temperature is 24.52 , Hydraulic oil Temperature is 24.17 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.27" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 241.66 , Clean gas temperature after demister is 22.33 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.74 , cold water supply pressure is 0.01 , cold water supply temperature is 24.61 , Hydraulic oil Temperature is 24.19 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 241.4 , Clean gas temperature after demister is 22.1 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.75 , cold water supply pressure is 0.01 , cold water supply temperature is 24.7 , Hydraulic oil Temperature is 24.2 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 241.42 , Clean gas temperature after demister is 21.88 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 24.77 , Hydraulic oil Temperature is 24.2 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.24 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 240.62 , Clean gas temperature after demister is 21.63 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.77 , cold water supply pressure is 0.01 , cold water supply temperature is 24.88 , Hydraulic oil Temperature is 24.24 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.07 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 240.44 , Clean gas temperature after demister is 21.49 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 24.94 , Hydraulic oil Temperature is 24.24 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.03 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.33" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.61, Upstream blast furnace gas pressure control valve position 2 is 99.26 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 240.42 , Clean gas temperature after demister is 21.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.73 , cold water supply pressure is 0.01 , cold water supply temperature is 25.05 , Hydraulic oil Temperature is 24.27 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.06 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.35" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 240.39 , Clean gas temperature after demister is 21.29 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.77 , cold water supply pressure is 0.01 , cold water supply temperature is 25.12 , Hydraulic oil Temperature is 24.29 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.04 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.37" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 240.42 , Clean gas temperature after demister is 21.07 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.73 , cold water supply pressure is 0.01 , cold water supply temperature is 25.18 , Hydraulic oil Temperature is 24.3 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.01 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.36" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 240.28 , Clean gas temperature after demister is 20.84 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.82 , cold water supply pressure is 0.01 , cold water supply temperature is 25.25 , Hydraulic oil Temperature is 24.32 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.38" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 240.27 , Clean gas temperature after demister is 20.7 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.77 , cold water supply pressure is 0.01 , cold water supply temperature is 25.32 , Hydraulic oil Temperature is 24.32 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.41" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 239.72 , Clean gas temperature after demister is 20.73 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 25.37 , Hydraulic oil Temperature is 24.33 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.41" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.21 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 239.56 , Clean gas temperature after demister is 20.61 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 25.43 , Hydraulic oil Temperature is 24.35 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.41" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 239.37 , Clean gas temperature after demister is 20.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.72 , cold water supply pressure is 0.01 , cold water supply temperature is 25.46 , Hydraulic oil Temperature is 24.36 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.42" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.21 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 239.39 , Clean gas temperature after demister is 20.31 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.61 , High pressure network Blast Furnace gas flow rate is 20.65 , cold water supply pressure is 0.01 , cold water supply temperature is 25.52 , Hydraulic oil Temperature is 24.37 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.45" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.57, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 239.32 , Clean gas temperature after demister is 20.18 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.72 , cold water supply pressure is 0.01 , cold water supply temperature is 25.56 , Hydraulic oil Temperature is 24.39 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.45" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.57, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 239.32 , Clean gas temperature after demister is 20.05 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.74 , cold water supply pressure is 0.01 , cold water supply temperature is 25.6 , Hydraulic oil Temperature is 24.4 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.46" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.57, Upstream blast furnace gas pressure control valve position 2 is 99.04 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 239.3 , Clean gas temperature after demister is 20.02 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 25.63 , Hydraulic oil Temperature is 24.42 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.48" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.56, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 239.27 , Clean gas temperature after demister is 19.86 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 25.67 , Hydraulic oil Temperature is 24.44 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.48" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 239.16 , Clean gas temperature after demister is 19.73 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 25.69 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.21 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.5" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.22 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 239.2 , Clean gas temperature after demister is 19.56 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 25.72 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.5" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 238.62 , Clean gas temperature after demister is 19.56 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 25.72 , Hydraulic oil Temperature is 24.46 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 238.65 , Clean gas temperature after demister is 19.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 25.75 , Hydraulic oil Temperature is 24.47 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 238.34 , Clean gas temperature after demister is 19.35 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 25.74 , Hydraulic oil Temperature is 24.48 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.55, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 238.17 , Clean gas temperature after demister is 19.07 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 25.75 , Hydraulic oil Temperature is 24.5 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.09" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.54, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 238.22 , Clean gas temperature after demister is 19.01 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.64 , cold water supply pressure is 0.01 , cold water supply temperature is 25.76 , Hydraulic oil Temperature is 24.51 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.97 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.1" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.54, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 238.17 , Clean gas temperature after demister is 19.0 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 25.76 , Hydraulic oil Temperature is 24.52 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.97 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.53, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 238.0 , Clean gas temperature after demister is 18.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 25.75 , Hydraulic oil Temperature is 24.51 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.97 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 238.1 , Clean gas temperature after demister is 18.82 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 25.75 , Hydraulic oil Temperature is 24.53 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.94 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.1" |